Delhi NCR finally has a second airport. Noida International Airport, also called Jewar Airport, opened for commercial flights on 15 June 2026. It sits at Jewar in western Uttar Pradesh, about 66 km in a straight line from Delhi’s Indira Gandhi International Airport, and is planned to grow to 70 million passengers a year.

Quick facts: airport code DXN; one 3,900 m runway; a first terminal for 12 million passengers a year; IndiGo and Akasa Air flying domestic routes; road access via the Yamuna Expressway, with metro and rail links still planned. In October 2026 the Uttar Pradesh cabinet approved renaming it Narendra Modi International Airport.

Below we explain everything step by step: the long history, the terminal and runway, airlines and routes, how to get there, the expansion plan, and the open issues. For Mumbai’s new second airport, see our guide to Navi Mumbai International Airport.

Noida International Airport at a Glance

ItemNoida International Airport
Also calledJewar Airport; renaming to Narendra Modi International Airport approved 9 Oct 2026
CodesIATA: DXN; ICAO: VIND
LocationJewar, Gautam Buddha Nagar district, Uttar Pradesh
ServesDelhi National Capital Region and western Uttar Pradesh
OpenedInaugurated 28 March 2026; commercial flights from 15 June 2026
Runway10/28, 3,900 m x 45 m, with ILS for 24-hour operations
Terminal 1101,590 m2, 28 apron stands
Phase 1 capacity12 million passengers a year
Planned capacity70 million passengers a year (Phase 4)
OwnerNoida International Airport Limited (NIAL)
OperatorYamuna International Airport Pvt Ltd, a Zurich Airport International company
Concession40 years, 2021 to 2061 (design, build, finance, operate and transfer)

Source: Wikipedia: Noida International Airport (October 2026). Distance to Delhi airport: FlyingFuel great-circle calculation.

A 25-Year Journey

According to Wikipedia, the airport was first proposed in 2001 as the Taj International Aviation Hub by then Uttar Pradesh Chief Minister Rajnath Singh. For years it was stuck, partly because it was close to Delhi’s airport, whose concession gave it a right of first refusal on a nearby airport. At one point the project was considered for Agra, before it moved back to Jewar in 2014.

DateMilestone
June 2017Central government approves the project
May 2018Ministry of Civil Aviation gives in-principle approval
November 2019Zurich Airport International wins the bid to build and run the airport
7 October 202040-year concession agreement signed
25 November 2021Foundation stone laid
June 2022Tata Projects wins the construction contract for Phase 1
September 2023IATA assigns the code DXN
November 2023IndiGo signs on as launch carrier; Akasa Air follows in January 2024
December 2024IndiGo validation flight tests approach procedures and navigation aids
6 March 2026DGCA grants the aerodrome licence
28 March 2026Phase 1 inaugurated
15 June 2026Commercial flights begin with an IndiGo flight from Lucknow
9 October 2026UP cabinet approves renaming it Narendra Modi International Airport

The airport was originally meant to open in 2022, so it arrived about four years late, a familiar story for big Indian airport projects.

Runway, Terminal and Design

Phase 1 has one runway, 10/28, which is 3,900 m long and 45 m wide, with an instrument landing system and lighting for 24-hour operations. That is long enough for large widebody jets. The airport has parking for 24 Code C aircraft (the size of an A320 or 737) and two Code D/F stands for big widebodies, and Category 9 airport fire and rescue cover.

The Terminal 1 building covers 101,590 m2 with 28 apron stands. It was designed by a consortium of Grimshaw, Nordic – Office of Architecture, Haptic and STUP, chosen through a design competition in 2020. Wikipedia describes design elements inspired by Indian ghats and havelis, and green spaces inside the building, including a landscaped courtyard that brings in daylight and fresh air. The design won the Architectural Review Future Projects Award in 2022.

The airport aims for carbon net-zero operations. Its ground handler has said all its ground equipment will be electric, the airport has airside EV charging, and Tata Power has agreed to supply wind and solar power.

Cargo and maintenance

A multi-modal cargo hub, developed by Air India SATS, is designed to handle over 250,000 tonnes a year at first and up to about 1.8 million tonnes later. The airport also has a 40-acre aircraft maintenance area, and in March 2026 Akasa Air announced plans for its first maintenance, repair and overhaul (MRO) facility there.

Airlines and Routes

In October 2026, two airlines fly from Noida International Airport, both on domestic routes:

AirlineDestinations (October 2026)
IndiGoAmritsar, Bareilly, Bengaluru, Bhopal, Chandigarh, Dehradun, Dharamshala, Hyderabad, Jaipur, Jammu, Jodhpur, Kishangarh, Lucknow, Mumbai, Navi Mumbai, Pantnagar, Srinagar, Udaipur
Akasa AirBengaluru, Kolkata, Mumbai, Navi Mumbai

Source: Wikipedia airport destination list. Routes change often; check with the airline.

IndiGo is the launch carrier and flies most routes. Interestingly, both airlines link Noida with Mumbai’s new airport, so you can now fly between Delhi NCR’s and Mumbai’s second airports. For the aircraft you will fly on, see our IndiGo fleet guide and 737 MAX 8 review (Akasa Air flies an all-Boeing 737 MAX fleet).

The airport is built as an international airport, but no international routes appear in the October 2026 lists.

How to Reach Noida International Airport

For now, getting there is mainly by road. Wikipedia notes that reaching the airport from central Delhi and Noida remains a concern, because rail links are still being planned.

By road

  • Yamuna Expressway: the main road access. NH 44 and NH 34 also serve the region.
  • Buses: the operator has agreements with Uttarakhand, Haryana and Uttar Pradesh state transport, for services to cities such as Dehradun, Haridwar, Gurgaon, Faridabad, Chandigarh, Noida, Greater Noida, Ghaziabad, Agra, Aligarh and Mathura.
  • Taxis and ride-hailing: Uber has dedicated pick-up zones, and Mahindra Logistics Mobility runs an all-electric taxi fleet from the terminal.
  • Coming soon: a 31.42 km corridor from the Delhi-Mumbai Expressway spur, approved in March 2026, will improve access from South Delhi, Faridabad and Gurugram. A 25 km road from Greater Noida West was approved in October 2025.

By metro and rail (planned)

LinkStatus
Greater Noida to Noida Airport Metro (Aqua Line extension)Planned
Ballabhgarh to Noida Airport Metro (Violet Line extension)Proposed
Ghaziabad to Jewar RRTS (71.1 km, 11 stations)Planned
Palwal to Noida Airport to Khurja railway (61 km)Proposed
Delhi to Varanasi high-speed rail, with a Noida Airport stationPlanned

A 20-acre Ground Transportation Centre between Terminal 1 and the future Terminal 2 will bring taxis, buses and, later, metro and Namo Bharat stations together.

The Expansion Plan: From 12 to 70 Million Passengers

FlyingFuel bar chart of Noida International Airport capacity by phase: Phase I 12 million passengers a year, Phase II 30 million, Phase III 50 million and Phase IV 70 million
Noida International Airport is planned to grow from 12 to 70 million passengers a year in four phases. Graphic: FlyingFuel. Data: YEIDA, Wikipedia.

The Yamuna Expressway Industrial Development Authority (YEIDA) describes a four-phase build-out costing a total of Rs 29,561 crore:

PhaseCapacityCostTimingKey additions
I12 millionRs 4,588 croreFY23 to FY27One runway, Terminal 1 (open now)
II30 millionRs 5,983 croreFY31 to FY32Bigger terminal, apron, cargo and support facilities
III50 millionRs 8,415 croreFY36 to FY37Second 4,150 m runway, Terminal 2, Ground Transportation Centre
IV70 millionRs 10,575 croreFY40 to FY50Up to 489,700 aircraft movements a year, 186 apron stands

Source: YEIDA phase table, via Wikipedia.

YEIDA’s own project page goes even further, showing a long-term concept with six runways.

What It Means for Delhi NCR

Delhi’s Indira Gandhi International Airport is one of the world’s busiest; see our list of the busiest airports in the world. A second airport gives airlines room to add flights, and passengers from Noida, Greater Noida, Ghaziabad and western Uttar Pradesh a closer option. Mumbai has followed the same path with Navi Mumbai, which opened in December 2025.

For travellers, the main trade-off today is access: if you live in central or west Delhi, the trip to Jewar is long until the planned rail links arrive. If you live in east NCR or western UP, it can be much easier than Delhi. Always check which airport your ticket is from; Noida is DXN and Delhi is DEL. Our regional airlines and UDAN guides explain how smaller routes from airports like these are growing.

Open Issues

  • Connectivity: distance from Delhi and Noida, with metro and rail links still at the planning stage.
  • Environment: environmentalists have raised concerns about the Dhanauri wetlands, about 15 km from the airport, which had not received protection status as of early 2024.
  • Land and resettlement: land acquisition and rehabilitation have been contentious; in March 2026 some displaced farmers said promised jobs and rehabilitation had not been fully delivered.

Key Takeaways

  • Noida International Airport (DXN) at Jewar opened for commercial flights on 15 June 2026, about four years late.
  • Phase 1 has a 3,900 m runway and a terminal for 12 million passengers a year; four phases could take it to 70 million.
  • IndiGo and Akasa Air fly domestic routes; no international flights yet.
  • Access is mainly by road for now; metro, RRTS and high-speed rail links are planned.
  • Uttar Pradesh has approved renaming it Narendra Modi International Airport.

Frequently Asked Questions

When did Noida International Airport open?

Phase 1 was inaugurated on 28 March 2026 after the DGCA granted the aerodrome licence on 6 March 2026. Commercial flights began on 15 June 2026, with an IndiGo flight from Lucknow.

What is the airport code of Noida International Airport?

The IATA code is DXN and the ICAO code is VIND. IATA assigned DXN in September 2023.

Where is Noida International Airport?

At Jewar in the Gautam Buddha Nagar district of Uttar Pradesh, next to the Yamuna Expressway. It serves the National Capital Region and western Uttar Pradesh. By our calculation it is about 66 km in a straight line from Delhi’s Indira Gandhi International Airport.

Which airlines fly from Noida airport?

IndiGo, the launch carrier, and Akasa Air. In October 2026 IndiGo listed flights to cities including Bengaluru, Hyderabad, Mumbai, Navi Mumbai, Lucknow, Jaipur, Srinagar and Amritsar, and Akasa Air to Bengaluru, Kolkata, Mumbai and Navi Mumbai.

Does Noida airport have international flights?

It is built as an international airport, but the October 2026 destination lists show only domestic routes so far.

How do I reach Noida International Airport?

Mainly by road for now, via the Yamuna Expressway, with buses from Uttar Pradesh, Haryana and Uttarakhand, taxis and Uber. A metro link from the Noida Aqua Line, a Ghaziabad to Jewar RRTS line and a high-speed rail station are planned but not built yet.

What is the new name of Noida airport?

On 9 October 2026 the Uttar Pradesh cabinet approved a proposal to rename it Narendra Modi International Airport.

Who built and operates Noida airport?

Yamuna International Airport Private Limited (YIAPL), a subsidiary of Zurich Airport International, under a 40-year public-private partnership signed in October 2020. Tata Projects built the first phase.

How big will Noida airport become?

Phase 1 handles 12 million passengers a year. Three more phases are planned to take it to 70 million, with a second 4,150 m runway in Phase 3. The YEIDA concept even shows six runways in the long term.